Process | Sender | Receiver |
---|---|---|
31-60 00 00 Implementation Phase | 34-35 15 11 Contractor | 34-35 10 14 Fabricator |
Different structural systems and materials impose their own information requirements and workflows. These have been identified by the Precast Concrete Institute (PCI), American Institute of Steel Construction (AISC), and the American Concrete Institute (ACI).
For fabrication of structural steel and miscellaneous steel (such as for railings), elements contained within a bridge model and their connectivity may be used by a fabricator to elaborate, however typically do not carry sufficient detail to be directly used by CNC machines for automated production. The most common data format in use for this detail is DSTV, commonly having a file extension of "NC1". Information captured for steel fabrication may include:
NOTE This exchange currently provides minimal information to be useful for the downstream Design Plans exchange; it is anticipated to be elaborated in a future extension.
![]() | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Entity/Concept | Attributes | Constraints | I | E | ||||||||||||||||
IfcBeam | ||||||||||||||||||||
Structural Curve Assignment | ReferencedBy | R | R | |||||||||||||||||
Annotation 2D Geometry | Representation |
| O | O | ||||||||||||||||
Element Positioning | PositionedFrom |
| O | O | ||||||||||||||||
IfcCostItem | ||||||||||||||||||||
Object Nesting | IsNestedBy |
| O | O | ||||||||||||||||
Control Assignment | Controls |
| R | R | ||||||||||||||||
IfcCostSchedule | ||||||||||||||||||||
Object Nesting | IsNestedBy |
| R | R | ||||||||||||||||
IfcMember | ||||||||||||||||||||
Element Nesting | IsNestedBy |
| O | O | ||||||||||||||||
Surface Connectivity | ConnectedFrom |
| R | R | ||||||||||||||||
IfcPlate | ||||||||||||||||||||
Surface Connectivity | ConnectedFrom |
| R | R | ||||||||||||||||
Body SweptSolid Extruded Arbitrary Geometry | Representation | O | O | |||||||||||||||||
Annotation 2D Geometry | Representation |
| O | O | ||||||||||||||||
Element Nesting | IsNestedBy |
| R | R | ||||||||||||||||
IfcPlateType | ||||||||||||||||||||
Type Body SweptSolid Extruded Arbitrary Geometry | RepresentationMaps | O | O | |||||||||||||||||
Type Body SweptSolid Extruded Arbitrary Void Geometry | RepresentationMaps | O | O | |||||||||||||||||
IfcProject | ||||||||||||||||||||
Project Declaration | Declares Phase ObjectType LongName |
| R | R | ||||||||||||||||
Project Units | UnitsInContext Phase ObjectType LongName |
| R | R | ||||||||||||||||
Project Representation Context | RepresentationContexts Phase ObjectType LongName |
| R | R | ||||||||||||||||
IfcProjectOrder | ||||||||||||||||||||
Aggregation | PredefinedType IsDecomposedBy Decomposes |
| R | R | ||||||||||||||||
IfcRoot | ||||||||||||||||||||
Object Ownership | OwnerHistory | O | O | |||||||||||||||||
IfcSlab | ||||||||||||||||||||
Element Positioning | PositionedFrom |
| O | O | ||||||||||||||||
IfcWorkSchedule | ||||||||||||||||||||
Control Assignment | Controls |
| O | O |