Contact Us   |   Your Cart   |   Sign In   |   Join
buildingSMART alliance March 2012 COBie Challenge: FM Systems

March 2012 COBie Challenge: FM Systems

NATIONAL FACILITY MANAGEMENT & TECHNOLOGY TRADESHOW
BALTIMORE, MD
by E. William East, PhD, PE - Engineer Research and Development Center, U.S. Army Corps of Engineers

The Construction Operations Building information exchange (COBie) information exchange format is a non-proprietary platform for the exchange of facility life-cycle data needed by facility managers. A COBie Challenge is a public event where the production and/or consumption of COBie data are presented by the software company with an independent assessment of the results of that product's ability to meet the COBie data format and data quality requirements. The March 2012 COBie Challenge focused on the consumption of COBie data by Computerized Maintenance Management Systems (CMMS) and Computerized Asset Management Systems (CAFM). In this challenge, CMMS/CAFM software vendors imported a set of simulated facility management information from the Common BIM files project, the Medical/Dental Clinic. The specific model file used was the COBie Handover file (ZIP).

This page provides links to the information presented at the Challenge to evaluate the product listed against the COBie specification. The version of COBie exercised in this challenge was COBie 2.4. COBie 2.4 was introduced for this challenge for two reasons. COBie 2.4 ensures consistency between the SPie product data exchanges and COBie format. COBie 2.4 also ensures compliance with United Kingdom mandate for COBie starting in 2012. COBie 2.4 is backward compatible with previous COBie versions from 2.24 forward.

Product Information

Product FM: Interact
Logo Logo (JPG 83 KB)
Version 8.0.2
Overview Presentation (PPT 1 MB)
COBie Configuration Configuration Guide (PDF 75 KB)
Contact Contacts (PDF 75 KB)
COBie Producer? No
COBie Consumer? Yes

COBie Consumer Challenge

The following table identifies which of the COBie handover information was consumed by the subject product.

Information COBie Sheet Imported
spaces and equipment Space, Type, Component check
PM schedules Job -
safety procedures Job -
systems System -
system procedures Job -
materials, tools, training Resource -
associated documents Document -
replacement parts Spare -
space and equipment properties Attribute check
space zones Zone -

To assess the quality of the imported information a series of meetings was held with each vendor leading up to the public challenge event. The objective of these meetings was to evaluate the products ability to consume the information noted in the table above using a quality control checklist (PDF) developed for the Clinic building information being consumed. The completed checklist (PDF) contains the full analysis of the imports achieved by the vendor. A summary of the result is provided below with footnotes indicating any special comments made during the quality assurance process.

Information COBie Sheet Result (Notes)
spaces and equipment Space, Type, Component Pass
PM schedules Job -
safety procedures Job -
systems System -
system procedures Job -
materials, tools, training Resource -
associated documents Document -
replacement parts Spare -
space and equipment properties Attribute Pass
space zones Zone -

Back to the COBie Challenge

Community Search
Latest News
Calendar

9/28/2016
BSSC Webinar: Response Spectrum Analysis/Linear Response History Analysis

10/4/2016
Workshop: Your Building Control Systems Have Been Hacked, Now What?

10/12/2016
Workshop: Zeroing in on Schools: Transforming New and Existing K-12 Buildings to Zero Energy

10/18/2016
Introduction to Cybersecuring Building Control Systems Workshop (October 2016)

10/19/2016
Advanced Cybersecuring Building Control Systems Workshop (October 2016)