Ongoing Development

HAZUS-MH MR3 Patch 3
NIBS anticipates delivering HAZUS-MH MR3 Patch 3 to FEMA in the Fall of 2008 with the following improvements:

  • Capability to better manage user-defined facilities data
  • Capability to remove in one step, all problem reaches generated in Hydrology
  • Optimized Flood AAL analysis


HAZUS-MH MR4
NIBS anticipates delivering MR4 to FEMA in late winter 2009 with the following improvements:

  • Dam/levee analysis capability
  • Capability to distinguish between PreFIRM and PostFIRM census blocks
  • Updated fire-following module in the Earthquake Model
  • Windows Vista (32 bit) compatible


   
Visit NIBS


NIBS   |   1090 Vermont Avenue NW, Suite 700   |   Washington, DC 20005
Phone: (202) 289-7800   |   Fax: (202) 289-1092