__________________________________________________________________________________________________________ PERFORMANCE REQUIREMENTS SUMMARY __________________________________________________________________________________________________________ | | | MAXIMUM ALLOWABLE | | PROPORTION OF REQUIRED | PARAGRAPH | STANDARD | DEGREE OF DEVIATION | METHOD OF | REQUIRED SERVICE SERVICE | NUMBER | | FROM REQMT. (AQL) | SURVEILLANCE | TO TOTAL CONTRACT ______________|___________|______________________|______________________|______________|_____PRICE________ | | | | | 0010AW Inspect| C.5.21 |Accomplish per | 10% Lot is number of | Random | $______ maintain, re- | |procedure IAW schedule| requests per month. | Sampling | pair and re- | |and Section C. | All defects cured | | place Cascade-| | | within ______. | | type | | | | | refrigeration | | | | | equipment. | | | | | | | | | | 0010AX Inspect| C.5.22 |Accomplish per | 10% Lot is number of | Random | $______ maintain, re- | |procedure IAW schedule| requests per month. | Sampling | pair and re- | |and Section C. | All defects cured | | place constant| | | within ______. | | temperature & | | | | | humidity con- | | | | | trol equipment| | | | | | | | | | 0010AY Inspect| C.5.23 |Accomplish per | 10% Lot is number of | Random | $______ maintain, re- | |procedure IAW schedule| requests per month. | Sampling | pair and re- | |and Section C. | All defects cured | | place heat and| | | within ______. | | humidity con- | | | | | trolled oven | | | | | equipment. | | | | | | | | | | 0010AZ Inspect| C.5.24 |Accomplish per | 10% Lot is number of | Random | $______ maintain, re- | |procedure IAW schedule| requests per month. | Sampling | pair and re- | |and Section C. | All defects cured | | place cooling | | | within ______. | | tower | | | | | equipment. | | | | | | | | | | | | | | | | | | | | ______________|___________|______________________|______________________|______________|__________________ Reference, DA Pamphlet 715-15 Form 5473-R 1