UNIT PRICE SCHEDULE PART I SECTION B. SUPPLIES/SERVICES AND PRICES/COSTS ___________________________________________________________________________ Item | | | | Unit | No | Item Description | Quality| Unit | Cost | Total Cost ______|__________________________|________|________|_______|_______________ 0010 AIR-CONDITIONING & REFRIGERATION PLANTS AND SYSTEMS OPERATIONS, MAINTENANCE AND REPAIR ___________________________________________________________________________ | | | | | 0010AA| Inspect, maintain & | 12 | MO. |$_____ | $___________ | operate air-conditioning | | | | | systems. Level I | | | | | | | | | 0010AB| Inspect, maintain & | 12 | MO. |$_____ | $___________ | operate refrigeration | | | | | plants and systems. | | | | | Level I | | | | | | | | | 0010AC| Inspect, maintain & | 12 | MO. |$_____ | $___________ | repair instrument and | | | | | control systems. | | | | | Level I | | | | | | | | | 0010AD| Water treat closed | | EA. |$_____ | $___________ | loop systems. | | | | | | | | | 0010AE| Water treat, cooling | | EA. |$_____ | $___________ | towers (greater than 150 | | | | | ton capacity). | | | | | | | | | 0010AF| Water treat, cooling | | EA. |$_____ | $___________ | towers (between 50 and | | | | | 150 ton capacity). | | | | | | | | | 0010AG| Water treat, cooling | | EA. |$_____ | $___________ | towers (less than 50 ton | | | | | capacity). | | | | | | | | | 0010AH| Replace the following | | | | | requirements: | | | | | | | | | | a. Instrument and control| | | | | systems. | | EA. |$_____ | $___________ | | | | | | | | | | ______|__________________________|________|________|_______|_______________ 1 B-6 2